The project was commissioned by Centrum Hevelius Sp. z o. o. S. K. A. The regulation covered a section of the Strzyża river in the area of Nad Stawem Street and Jana Kilińskiego Street, where the technical condition of the riverbed structure showed serious damage. As part of the regulation of the Strzyża river,it was necessary to make water equipment in the form of chambers (separation chamber, side chamber, transition chamber, collective chamber and end chamber), covered and open canals and pipelines (transit pipeline and discharge pipeline).
In addition, the chambers of separation and transition chambers are equipped with wall-mounted valves, which make it possible to control the flow.