Dewatering of the area is performed to protect existing buildings as well as earthworks and building construction from the destructive action of water. To drain the incoming flow - water intakes must be made and if necessary the deep drainage of the subsoil.
Before proceeding to any construction works, all the reservoirs and watercourses located on the construction site shall be drained or regulated in order to protect against their later threat. These works are performed in accordance with the previously prepared design.
Lowering of the groundwater level may be necessary in some cases (when the groundwater makes it difficult to foundation of the designed structures and equipment or impedes execution of the excavation).
Dewatering should be carried out in a way that the structure of the subsoil under executed construction and the neighboring buildings will not be violated, and the excessive settlements of the adjacent objects as a result of generated drawdown will not occur.
- maintaining assumed in the design water levels and pore pressures without significant
fluctuations
- ensuring continuous outflow of the given quantity of the water
- total drainage of the excavation beyond its area
- guarantee the reliability of the dewatering system